Wednesday, May 15, 2013

Progress after a pause

After taking a break for about four months, we're working on the camper again. This weekend we moved it to its permanent location beside the meter base and sewer line. Craig finished the walls in the bedroom. Put down a floor in the bedroom and a large area rug. We finally put the bed back in. All we need to do now paint the primed kitchen walls and finish the floor in the main living area. We need to sand it. Then, we need to paint it. We finally feel like we can see the light at the end of the tunnel.
Sealing the bedroom windows
Cranking up the jacks for the short move
Finishing touches on the bedroom walls

No comments:

Post a Comment